A custom home takes about seven months from the first pour. Here is what happens in each of the six steps, what the foothills change, and what you decide.

About seven months, from the first pour

  1. 01Draw itBefore week 1
  2. 02Pour itWeeks 1–5
  3. 03Frame itWeeks 6–10
  4. 04Close it inWeeks 11–13
  5. 05Clad itWeeks 14–20
  6. 06Hand it overWeeks 21–30

30 weeks from the first pour. Inspections follow your building department’s schedule.

Timelines are typical for a sample build, not a promise. Weather, supply and inspections move them.

The six steps in detail

Step 1 of 6

Draw it

Before week 1

Survey, soils and drawings, agreed before we break ground.

We start with the lot, not the plan. A boundary and topographic survey shows slope, setbacks and drainage. On foothill parcels the slope often decides where the house can sit.

A geotechnical report follows. Foothill ground can be decomposed granite, clay that swells when wet, or shallow rock, and each one changes the foundation design and the budget. We would rather know eight weeks early than in week three.

We then settle the drawings and file the permit. Where the parcel sits near open rangeland, we ask the local fire authority early what it requires, because the answer can change siding, vents and the first five feet around the house.

Step 2 of 6

Pour it

Weeks 1–5

The lot at the first stage: a freshly poured concrete slab with plumbing stub-ups and a gravel border on raw graded dirt, foothills behind.Illustrative render

Footings below frost depth, then the slab, cured before framing.

We clear and grade, then dig the footings. Footings must sit below the local frost depth so freezing ground cannot lift them. The building department sets that figure for your parcel, and we build to it.

Underslab plumbing goes in over compacted gravel, then the inspector checks the footings and the pre-pour work. Only after that does the concrete truck come.

The slab is kept damp and left to cure before walls load it. Boise summers dry concrete fast, so curing is managed, not assumed.

Step 3 of 6

Frame it

Weeks 6–10

A framer in a hard hat and tool belt stands beside a wall of fresh studs.

The house takes shape, and the inspector signs off the structure.

Walls, floor joists and rafters go up, typically 16 inches apart on center. The engineer's details for hold-downs, shear walls and the ridge beam are followed exactly, and checked on site.

Windy foothill sites make bracing and temporary protection part of the daily routine, not an afterthought.

Before anything is covered, the framing inspection takes place, along with rough-in checks for electrical, plumbing and mechanical. We photograph every wall while it is still open.

Step 4 of 6

Close it in

Weeks 11–13

The house closed in: white weather barrier on the walls, the dark metal roof on and the windows in, before any siding.Illustrative render

Roof, windows and weather barrier, so the inside stays dry.

Roofing goes on first, then the windows, then the weather-resistant barrier with taped seams. From this point the house can take a storm.

For wildfire-aware building we favor a Class A roof assembly, such as standing-seam metal over a fire-rated underlayment, and tempered dual-pane glass. Gutters are metal and kept clear of debris.

Flashing is detailed at every window, roof valley and wall joint. Most water damage starts at a flashing detail, so we photograph these before they are covered.

Step 5 of 6

Clad it

Weeks 14–20

The finished exterior in bare topsoil: charcoal siding, stone base and cedar posts, with construction stakes and a silt fence at the front edge.Illustrative render

Fire-aware siding, stone base and insulation.

Siding is chosen for the site. Fiber cement and metal are noncombustible. Wood has a place on porch posts and soffits, kept off the ground and detailed to shed water.

Attic and crawlspace vents get ember-resistant mesh, and the first five feet around the house is planned as bare gravel or stone, not mulch.

Inside, insulation is installed and inspected before drywall. Foothill nights drop fast, so the thermal envelope matters as much as the finish.

Step 6 of 6

Hand it over

Weeks 21–30

The finished house shortly after sunset: every window lit, lanterns at the porch and low lamps along the path under a deep blue sky.Illustrative render

Finishes, final inspection and a written punch list.

Drywall, cabinetry, flooring, paint and fixtures go in, trade by trade. We close each room before the next trade starts, so finished work is not damaged by the one after it.

The final inspection and certificate of occupancy come before handover. Landscaping follows the drainage plan from step one, which keeps water moving away from the foundation.

We walk the house with you and write every item on a punch list. You get the list, the drawings as built and the photo folder from the whole build.

Inspections, in the order they happen

Your building department sets the exact list. For a typical sample build it looks like this.
Sample schedule, illustrative
WhenInspection
Before week 1Plan review and permit
Week 2Footings
Week 4Underslab plumbing and pre-pour
Week 9Framing, with rough-in checks
Week 17Insulation
Week 28Final and certificate of occupancy

Questions we are asked

How long does a build take?

About seven months from the first pour for a house of 2,000 to 3,500 square feet, plus design and permitting before that.

Do you build on sloped foothill lots?

Yes. The survey and soils report come first, because the slope and the ground decide the foundation.

What does wildfire-aware mean?

Class A roofing, noncombustible siding where required, ember-resistant vents and a bare zone beside the walls. We follow whatever your local authority requires.

Can I visit during construction?

Yes. Book a site walk. We schedule them at stages when the site is safe to walk.

Do you publish prices?

Not on this site. Cost depends on your lot, so we price after the soils report. The sample plans here carry no prices.